1. Executive Summary

S. 5653 changes federal permitting procedures, environmental reviews, and energy-related cost and program rules by amending existing federal laws.

2. What This Bill Would Do

  • [Section 1106 — Timely and Unified Federal Reviews (bill pp. 31–60)]: Sets rules for lead-agency designation, joint reviews, and review schedules for environmental reviews and permit decisions. It also establishes a process for resolving certain environmental-review or authorization disputes or delays involving more than one federal agency. After receiving a project sponsor's notification, the Chairman consults with the participating agencies and is directed to facilitate resolution within the statutory period; if the dispute remains unresolved, the Chairman must determine a resolution and order the relevant agencies to act. Under Section 1106, the Chairman's dispute-resolution determination is not subject to judicial review, whereas judicial review and remedies for covered National Environmental Policy Act (NEPA) agency actions are governed separately by Section 1110.

  • [Section 1202 — Water Quality Certifications (bill pp. 103–122)]: Changes how States and Tribes—known as certifying authorities (the State or Tribal entity responsible for reviewing a water quality certification)—review water quality certifications for certain federal permits. It sets prefiling, public-notice, and application completeness procedures. It provides that the licensing or permitting agency establishes a reasonable review period, in consultation with the certifying authority, subject to a statutory maximum of one year (or nine months for covered interstate linear infrastructure). Extensions require a written request from the applicant and written concurrence from the certifying authority. Under the specific statutory conditions in Section 1202, the bill separates automatic waiver (when the certifying authority does not act by the end of the reasonable period and the period has not been extended, the certification requirement is waived) from affirmative waiver (the certifying authority may waive the certification requirement at any time during the reasonable review period without applicant written concurrence required as a condition of that waiver). A waiver of the certification requirement under Section 1202 is not subject to judicial review. It also restricts denials and certification conditions—including applying a clear-and-convincing evidence standard (a high legal standard requiring strong evidence)—and provides that if an applicant voluntarily withdraws the certification application and submits a new application, the reasonable review period restarts.

  • [Section 1304 — State Assumption of Consultation (bill pp. 137–153)]: Allows the Secretary of the Interior, through a written agreement, to assign specified intrastate consultation responsibilities under Section 7(a), (b), and (c) of the Endangered Species Act to a qualifying State. States must meet statutory requirements and enter into written agreements before assuming those responsibilities, subject to agency rulemaking.

  • [Section 1401 — Project Certainty (bill pp. 158–165)]: Limits when federal agencies may take covered new actions to revoke, suspend, or alter certain existing federal authorizations or permits for projects with non-Federal sponsors, subject to statutory exceptions. It also sets notice requirements, court review rules, and potential remedies or damages if an agency violates those rules.

  • [Section 2107 — Ratepayer Protection (bill pp. 226–239)]: Changes how certain covered computing loads pay for electricity transmission. It directs the Federal Energy Regulatory Commission (FERC) to revise its 1994 transmission pricing policy and establish rules on cost recovery (including exit charges) and financial assurances for covered loads, subject to agency rulemaking, while preserving certain previously approved service arrangements

3. Who is Affected

  • Federal agencies and designated key permitting agencies (including the Council on Environmental Quality, the Chairman, agency Chief Environmental Review and Permitting Officers [CERPOs—senior officials who coordinate environmental reviews and permits], Senior Executive Service [SES—a federal management and leadership personnel system] supervisory personnel, agency heads, the Secretary of the Army, the U.S. Army Corps of Engineers, the Secretary of the Interior, the Secretary of Agriculture, the U.S. Fish and Wildlife Service, the Secretary of Energy, the Federal Energy Regulatory Commission [FERC—the federal agency that regulates certain energy activities and transmission], and the Energy Information Administration [EIA—the federal statistical agency for energy data] Administrator).

    • If the bill passes: Responsibilities and consequences differ by provision rather than applying uniformly to every listed entity. Federal agencies subject to NEPA must update implementing procedures within 180 days and follow applicable review timelines. The Chairman, coordinating with the General Services Administration, maintains the Environmental Review and Permitting Tracker under Section 1132, while agencies implement electronic permitting (ePermit—an online permitting system) and eNEPA deadlines by December 1, 2028. The Secretaries of the Interior and Agriculture must develop or adopt categorical exclusions (categories of actions that normally do not require a detailed environmental review) within 180 days for covered electric grid activities under Section 2214, subject to extraordinary circumstances. The Secretary of the Interior carries out Endangered Species Act rulemaking and consultation duties (Sections 1301–1307), geothermal leasing, ombudsman/task force, pending-civil-action 60-day decision duties, cost recovery, and Gold Book duties within the Bureau of Land Management (Sections 2221–2228), historic-preservation program evaluation/oversight/audits (Section 2301), and lead-agency coordination for offshore transmission alongside the Secretary of Energy (Section 2252). FERC conducts transmission and market rulemakings (Sections 2101–2115), submits a 270-day hydropower market-barriers report, issues hydropower maintenance/variance guidance and a final rule while retaining dam-safety authority, administers micro-hydrokinetic licensing (Sections 2231–2234), and exercises employee law-enforcement protection authority (Section 2243). The EIA Administrator carries out Form 861 data collection on computational-load entities (Section 2114). Specific limits, remedies, or consequences apply to the particular agencies governed by those provisions when statutory rules are not met.

    • If the bill fails or status quo continues: The existing statutory and regulatory framework would remain in place for agency timelines, review steps, data systems, and court review rules.

    • Governing sections: Sections 1101–1133, 1201–1205, 1301–1307, 1401–1403, 2101–2115, 2201, 2211–2215, 2221–2252, and 2301–2302.

  • Project sponsors and applicants (private, public, public-private, State, local, or Tribal entities seeking permits, licenses, authorizations, or rights-of-way—legal permission to use or cross land).

    • If the bill passes: Eligible applicants are subject to specified prefiling, public-notice, completeness, and decision timelines under applicable provisions. Eligible sponsors may request environmental impact statements (detailed reports examining expected environmental effects), submit records of stakeholder engagement, request written extensions of water quality certification periods, or seek court review and statutory remedies when applicable conditions are met. Voluntary withdrawal and resubmission of a water quality certification application under Section 1202 restarts the reasonable review period.

    • If the bill fails or status quo continues: Applicants remain subject to existing application completeness rules, required records, environmental review duties, applicable fees or cost-recovery charges, financial commitments, and permit conditions under the existing statutory and regulatory framework.

    • Governing sections: Sections 1102, 1105–1110, 1121, 1131–1132, 1202, 1204–1205, 1302, 1304–1305, 1401–1403, 2101, 2201, and 2213.

  • States, State agencies, and certifying authorities.

    • If the bill passes: Each State role has separate eligibility rules and obligations rather than applying uniformly to every State. Participating States may serve as joint lead agencies, have qualifying state or tribal reviews considered or incorporated, follow prefiling, public-notice, completeness, and reasonable review periods (up to one year, or nine months for covered interstate linear infrastructure) with restrictions on denials and conditions, or waive Clean Water Act section 401 certifications under the specific statutory conditions: automatically when the certifying authority does not act by the end of the reasonable period and the period has not been extended (subject to the voluntary withdrawal/resubmission restart rule), or affirmatively at any time during the reasonable review period (without applicant written concurrence required as a condition of that waiver), with any waiver under Section 1202 not subject to judicial review.

    • If the bill passes (additional State authorities): States may also apply for Coastal State Fund grants (subject to available appropriations—money Congress makes available for government programs—and coastal eligibility rules), refer local transmission planning processes to FERC, and exercise stated rate or solicitation rules for covered loads. Under Section 1304, a qualifying State seeking to assume the Secretary of the Interior's intrastate Endangered Species Act section 7(a), (b), and (c) consultation duties must demonstrate financial, legal, and staffing capacity, hold public notice and comment, waive sovereign immunity (legal immunity from suit) for assumed duties, and comply with written agreement terms, audits, federal oversight, and possible termination rules; assuming those duties does not grant the State the Secretary's federal rulemaking authority, and unassumed federal responsibilities remain with the Secretary.

    • If the bill fails or status quo continues: The existing statutory and regulatory framework would remain in place for State roles, certification rules, consultation procedures, and state regulatory authorities.

    • Governing sections: Sections 1102, 1105–1106, 1202, 1204–1205, 1304, 1306–1308, 2101, 2103–2104, 2107–2108, and 2211.

  • Indian Tribes.

    • If the bill passes: Tribes have distinct statutory authorities across different provisions rather than uniform or interchangeable powers. A Tribe may participate as a cooperating or joint lead agency, have Tribal reviews considered or incorporated, and receive a presumption of negative effects on Tribal trust resources for a no-action alternative under the specific circumstances where a review or action is Tribe-initiated.

    • If the bill passes (additional Tribal authorities): Tribes also have separate provisions for Clean Water Act section 401 certifications where treated as a State (subject to the same statutory waiver rules), assuming consultation responsibilities under Section 1304 subject to statutory conditions, granting rights-of-way across Tribal land under Interior-approved Tribal rules (subject to approval, compliance rules, and federal oversight), and receiving Tribal Historic Preservation Officer grants under Section 2302.

    • If the bill fails or status quo continues: The existing statutory and regulatory framework would remain in place for Tribal consultations, certifications, rights-of-way, and historic preservation programs.

    • Governing sections: Sections 1102, 1105–1106, 1202, 1304, 2101, 2103, 2108, 2211–2212, and 2302.

  • Local governments and political subdivisions (counties, boroughs, parishes, cities, and local authorities).

    • If the bill passes: Local governments may serve as cooperating or joint lead agencies, receive notices and pre-application outreach, and have affected property interests identified in transmission permitting. Under Section 2108, local governments may also choose whether to adopt streamlined permitting and inspection processes for qualifying distributed energy systems within the scope and limits of that statutory provision rather than a general grant of local permitting authority.

    • If the bill fails or status quo continues: The existing statutory and regulatory framework would remain in place for local governments.

    • Governing sections: Sections 1102, 1105–1106, 1202, 2101, and 2108.

  • Affected landowners, private property owners, farmers, and ranchers.

    • If the bill passes: Affected landowners—including owners within 500 feet of covered transmission facilities or rights-of-way—receive notice, consultation, and consideration of input in transmission permitting. If federal condemnation proceedings (using government authority to acquire private property for public use under applicable procedures) are used, the bill specifies that procedures under Federal Rule of Civil Procedure 71.1 apply. On covered non-Federal land within oil and gas drilling or spacing units, the bill sets limits on federal permits to drill and certain surface rules.

    • If the bill fails or status quo continues: The existing statutory and regulatory framework would remain in place.

    • Governing sections: Sections 2101 and 2211.

  • Electric utilities, transmitting utilities, public utilities, Transmission Organizations, and exempt transmitting utilities.

    • If the bill passes: Covered utilities and Transmission Organizations (entities that operate or coordinate electricity transmission and wholesale electricity markets) face revised transmission permitting and cost-allocation rules, a prohibition on federal rights of first refusal for selected regional or interregional transmission facilities, consolidated planning requirements, mandatory use and cost evaluation of advanced transmission technologies, queue-management rulemaking, grid data duties, and market and distribution rules for qualifying behind-the-meter distributed energy systems.

    • If the bill fails or status quo continues: The existing statutory and regulatory framework would remain in place.

    • Governing sections: Sections 2101–2115.

  • Electric customers and ratepayers (wholesale, retail, residential, commercial, industrial, and manufacturing customers).

    • If the bill passes: The bill restricts shifting incremental transmission costs from covered large computing loads onto other customers, subject to the statutory provisions, and limits involuntary allocation of transmission costs where no benefit or only a trivial benefit is received.

    • If the bill fails or status quo continues: The existing statutory and regulatory framework would remain in place.

    • Governing sections: Sections 2101, 2103–2104, and 2107.

  • Computational load owners, computational load operators, and data center entities.

    • If the bill passes: The bill applies specified transmission-pricing rules to covered computing loads with a demand of 20 megawatts or more, including certain facilities under common ownership or control and phased builds reasonably expected to reach that threshold at full buildout. Covered owners and operators may face revised rules on embedded average costs (existing system costs shared across service), incremental costs (additional costs caused by serving a specific customer or facility), exit charges, financial assurances (funds, guarantees, or financial commitments set aside to cover specified costs), State rate or solicitation rules, and EIA Form 861 data collection under Section 2114, while arrangements to serve covered loads approved by FERC or a State before enactment remain in effect.

    • If the bill fails or status quo continues: The existing statutory and regulatory framework would remain in place; these revised pricing, financial-assurance, and Section 2114 reporting requirements do not apply under current law.

    • Governing sections: Sections 2107 and 2114.

  • Distributed energy system owners, aggregators, and installers.

    • If the bill passes: The bill establishes wholesale-market participation requirements and restrictions, limits on certain Transmission Organization and distribution utility practices, and bars on double compensation (receiving payment twice for the same service during the same period) for qualifying behind-the-meter distributed energy facilities and aggregations rather than every behind-the-meter system. Eligibility distinguishes between an individual facility (rated capacity of at least 5 kilowatts) and an aggregation (at least two qualifying facilities with a combined capacity of at least 100 kilowatts), alongside the statutory capability to be brought online within 15 minutes when called for deployment and metering and telemetry (automated remote measurement and data reporting) requirements.

    • If the bill fails or status quo continues: The existing statutory and regulatory framework would remain in place.

    • Governing section: Section 2108.

  • Oil, gas, and mineral lessees and operators.

    • If the bill passes: Lessees and operators on covered non-Federal land within oil and gas drilling or spacing units are exempt from federal permits to drill under stated conditions, must follow federal notification rules for state permits or drilling plans, and face limits on specified Mineral Leasing Act bonding, entry, mitigation, and surface reclamation rules while excluding Indian lands and preserving royalty rules. Under Section 2229, qualifying oil, gas, and geothermal activities described in amended subsection (b) that require Mineral Leasing Act permits or Geothermal Steam Act drilling permits are not subject to NEPA requirements under new subsection (c)(2).

    • If the bill fails or status quo continues: The existing statutory and regulatory framework would remain in place.

    • Governing sections: Sections 2201, 2211, and 2229.

  • National Fish and Wildlife Foundation.

    • If the bill passes: The Foundation must establish and carry out the Coastal State Fund within one year after enactment, subject to the availability of appropriations, and distribute grant funds to coastal States under a statutory formula and cap.

    • If the bill fails or status quo continues: The Foundation does not operate a Coastal State Fund under this provision.

    • Governing section: Section 1308.

  • Geothermal developers and operators.

    • If the bill passes: Qualifying geothermal observation test projects receive a categorical exclusion subject to disturbance caps (generally no more than 10 acres per project and 100 acres total for multiple projects) and limits on roads, drilling equipment, duration, and site restoration (Section 2221). Developers and operators face revised royalty rules and definitions for geothermal electric generating facilities and in-service dates (Section 2222), annual lease sales with same-year replacement sales and drilling-permit completeness/action deadlines (Section 2223), a Bureau of Land Management geothermal ombudsman and permitting task force (Section 2224), removal of federal drilling-permit requirements on non-Federal surface estates where the United States owns less than 50 percent of the subsurface geothermal estate and the operator submits a State permit—excluding Indian land and preserving royalties and inspections (Section 2225), a 60-day decision deadline after completing applicable federal-law requirements for covered authorizations under an existing lease despite a pending civil action unless a federal court vacates the lease/authorization or grants injunctive relief (Section 2226), reimbursement for leasing, permitting, inspection, and monitoring costs with potential hardship or resource-use reductions (Section 2227), updated Gold Book procedures (Section 2228), and exemption from NEPA requirements under new subsection (c)(2) for qualifying activities described in amended subsection (b) requiring specified drilling permits (Section 2229).

    • If the bill fails or status quo continues: The existing statutory and regulatory framework would remain in place.

    • Governing sections: Sections 2221–2229.

  • Hydropower licensees and operators.

    • If the bill passes: Licensees and developers are affected by a 270-day FERC market-barriers report with public input (Section 2231) and a requirement that specified Federal Power Act license conditions be reasonably related to project effects (Section 2232). Under Section 2233, routine maintenance, repairs, and specified temporary variances beyond the licensee's reasonable control are distinguished from substantial and nonsubstantial alterations and relieved of certain prior-approval requirements via FERC guidance and a final rule, while preserving FERC dam-safety authority. Under Section 2234, qualifying micro-hydrokinetic projects up to 5 megawatts receive an expedited licensing process, 10- to 20-year license terms, categorical exclusions for low-disturbance activities, and a report to Congress.

    • If the bill fails or status quo continues: The existing statutory and regulatory framework would remain in place.

    • Governing sections: Sections 2231–2234.

  • Offshore energy generation developers and operators.

    • If the bill passes: Under Section 2251, Outer Continental Shelf Lands Act provisions governing interference with other uses and applicability to National Park System units, National Wildlife Refuge System units, National Marine Sanctuaries, and National Monuments are revised.

    • If the bill fails or status quo continues: The existing statutory and regulatory framework would remain in place.

    • Governing section: Section 2251.

  • Offshore transmission developers and operators.

    • If the bill passes: Under Section 2251, electricity-transmission rights-of-way are permitted in National Marine Sanctuaries with related permits or authorizations allowed to run for the duration of the right-of-way. Under Section 2252, the Secretaries of the Interior and Energy must identify preferred offshore transmission routes within two years (reviewed at least every three years), and the Interior Department serves as lead agency for coordinating federal authorizations and environmental reviews under a two-year rulemaking.

    • If the bill fails or status quo continues: The existing statutory and regulatory framework would remain in place.

    • Governing sections: Sections 2251–2252.

  • Hardrock mining mill-site operators and electric grid project participants.

    • If the bill passes: Under Section 2214, the Secretaries of the Interior and Agriculture must develop or adopt categorical exclusions within 180 days—subject to extraordinary circumstances—for placing transmission or distribution facilities in approved rights-of-way; repairing, maintaining, replacing, upgrading, modifying, optimizing, or making minor relocations or additions to existing facilities within existing rights-of-way or previously disturbed or developed land; and constructing, operating, upgrading, or decommissioning battery and other energy-storage technology on previously disturbed or developed land. Under Section 2215, qualifying mining operations may obtain additional mill-site claims of up to five acres each on public land that are reasonably necessary for waste-rock or tailings disposal or related mineral development operations under an approved plan of operations, without conveying mineral rights.

    • If the bill fails or status quo continues: The existing statutory and regulatory framework would remain in place.

    • Governing sections: Sections 2214–2215.

  • FERC Commissioners, Commission employees, and Northwest Power and Conservation Council.

    • If the bill passes: Section 2241 removes a paragraph from FERC consultation requirements in the Department of Energy Organization Act and adds economic or legal qualifications to specified certification requirements. Section 2242 amends Section 4(c)(10)(B) of the Pacific Northwest Electric Power Planning and Conservation Act (16 U.S.C. §839b(c)(10)(B)) by adding the phrase "since the date of enactment of the Bipartisan American Affordability and Jobs Act of 2026" without altering the Council's general authority. Section 2243 authorizes FERC to allow Commission employees to perform law-enforcement duties as needed to protect the Chairman and Commissioners while performing official duties.

    • If the bill fails or status quo continues: The existing statutory and regulatory framework would remain in place.

    • Governing sections: Sections 2241–2243.

  • State Historic Preservation Officers, Tribal Historic Preservation Officers, and historic preservation review stakeholders.

    • If the bill passes: Section 2301 revises the National Historic Preservation Act Section 106 review process (including a 30-day undertaking determination after a review request, establishing the area of potential effects—narrowed to where an undertaking may cause a defined adverse effect and excluding areas affected solely by project parts outside federal control or responsibility—identifying historic properties, consulting with State and Tribal Historic Preservation Officers, Tribes, Native Hawaiian organizations, local governments, and applicants, incorporating requested information within a 30-day information period, and setting consultation and advisory-comment timelines). Section 2301 also refines adverse effects to cover reasonably foreseeable consequences that directly alter characteristics of a historic property to diminish its integrity, excludes visual, atmospheric, or audible effects unless they would have a direct impact that would significantly diminish the eligible characteristics of the historic property, bars non-signatories from suing over implementation of covered programmatic agreements (a formal historic-preservation agreement covering a program or set of actions), and provides that identifying, nominating, or listing a property on the National Register after review begins does not by itself require delaying, reopening, supplementing, or modifying that review. Section 2301 also establishes State program evaluation rules (including a two-year period to address a disapproval, consultation timeline/metric compliance, suspension of specified contracts, cooperative agreements, and Historic Preservation Fund grants upon disapproval of a program or major aspect, federal assumption of State Historic Preservation Officer functions in specified circumstances, and fiscal audits at least every four years) and creates a new Tribal program-evaluation framework (evaluations at least every two years after approval, disapproval/suspension rules, federal assumption of functions in specified circumstances, and fiscal audits at least every four years). Section 2302 addresses Historic Preservation Fund authorizations and availability and Tribal Historic Preservation Officer grants (for online database development, subject to coordination, sensitive property protections, and annual reporting).

    • If the bill fails or status quo continues: The existing statutory and regulatory framework would remain in place.

    • Governing sections: Sections 2301–2302.

4. Existing Law vs. What Would Change

Current Law or Condition

What This Bill Changes

National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.): Existing law governs environmental reviews, 5-year programmatic environmental documents (reviews covering a broader program or group of related projects), categorical exclusions (categories of actions that normally do not require a detailed environmental review), application reviews, and court review.

Division A, Title I (Sections 1101–1133): Updates definitions and savings rules; sets a 180-day agency implementation deadline; allows combining categorical exclusions and using certain state, Tribal, or federal reviews; sets 1-year environmental assessment (an initial review of possible environmental effects) and 2-year environmental impact statement deadlines plus 90- and 120-day authorization deadlines; extends programmatic document reliance to 10 years; sets eNEPA (electronic tools and standards for environmental reviews) and ePermit deadlines by December 1, 2028; tasks the Chairman and General Services Administration with maintaining the Tracker; authorizes $20 million annually (FY2027–FY2033) for the Permitting Improvement Fund; makes the Chairman's Section 1106 dispute-resolution determinations unreviewable in court; and sets a 150-day statute of limitations (deadline to file a lawsuit) and court review limits in Section 1110.

Federal Water Pollution Control Act / Clean Water Act (33 U.S.C. 1314, 1341, 1342, 1344, 1369): Existing law governs water quality criteria, State/Tribal section 401 certifications, 5-year National Pollutant Discharge Elimination System (NPDES—the federal permit program for certain water discharges) and general permit terms, section 404(c) disposal site bans, nationwide permits, and court review.

Division A, Title II (Sections 1201–1205): Requires rulemaking for section 304(a) criteria; sets section 401 prefiling, public-notice, and completeness steps; sets reasonable review periods set by the federal permitting agency in consultation with the certifying authority up to a 1-year maximum (or 9 months for covered interstate linear infrastructure); requires written applicant request and certifying authority concurrence for extensions; restarts the reasonable review period upon voluntary withdrawal and resubmission; under specific statutory conditions, separates automatic waiver upon deadline expiration without extension or final action from affirmative waiver during the review period (without requiring applicant written concurrence as a condition of that waiver), with any waiver under Section 1202 not subject to judicial review; restricts denials and conditions (including clear-and-convincing evidence [a high legal standard requiring strong evidence] rules); extends NPDES and section 404 general permits from 5 years to 10 years; limits section 404(c) ban windows to the period between a complete application and permit decision; sets rules for discharges under 2 acres and covered nationwide permit renewals; and sets 150-day court review deadlines and remand standards under section 404.

Endangered Species Act of 1973 (16 U.S.C. 1532, 1533, 1536): Existing law governs definitions, listing decisions, 90-day and 150-day section 7 consultations, consultations for right-of-way projects, and court review.

Division A, Title III (Sections 1301–1308): Defines best scientific and commercial data standards; shortens section 7 consultation timelines from 90 to 60 days and 150 to 100 days (with a 145-day trigger and review alignment); exempts covered categorically excluded right-of-way projects from section 7(a)(2)–(4); allows the Secretary of the Interior, through a written agreement, to assign specified intrastate section 7(a), (b), and (c) consultation duties to a qualifying State (with unassumed federal duties remaining with the Secretary and a 270-day proposed rule deadline); sets a 150-day review period for section 7(b) opinions; requires use of qualifying State listing data; authorizes $150 million annually (FY2027–FY2031) for section 7 and section 7A; and directs the Foundation to set up the Coastal State Fund within one year after enactment, subject to appropriations, with $50 million annually authorized for FY2028–FY2032.

Project Certainty & Federal Authorizations: Existing administrative and judicial rules govern federal permits, authorizations, stop-work actions, and permit processing timelines.

Division A, Title IV (Sections 1401–1403): Restricts covered new agency actions against permits or authorizations in effect on or after September 16, 2026, for non-Federal sponsors, subject to exceptions, notice rules, agency burden of proof, and remedies/damages (25%–50% of incurred project costs under stated factors); sets a 1-year deadline for covered non-NEPA applications; and creates a cause of action (a legal basis to bring a lawsuit) for a pattern of disparate treatment (a demonstrated pattern of different treatment under statutory criteria) with remedies up to 50%–100% of reasonably expected construction costs under stated conditions.

Federal Power Act (16 U.S.C. 796, 824, 824p, 824s, 825p) & Natural Gas Act (15 U.S.C. 717f): Existing law governs transmission permitting, state siting/consultation, cost allocation, rights-of-way, interstate compacts, FERC authority, and interstate gas pipeline activities.

Division B, Title I (Sections 2101–2115): Revises section 216 permitting, state siting/consultation, cost allocation, and court review; creates exclusions or exemptions for covered grid and interstate pipeline activities; sets transmission studies, regional/interregional planning, local transmission state referrals, and a ban on federal rights of first refusal for selected regional/interregional lines; mandates rulemakings on combined planning, advanced transmission technologies, interconnection queues, grid data, power marketing agency compensation, FERC fees, and EIA Form 861 data on computational-load entities; and requires FERC to revise its 1994 transmission pricing policy within 270 days and set rules for embedded average and incremental costs on covered loads of 20 megawatts or more while preserving prior FERC- or State-approved service arrangements.

Mineral Leasing Act (30 U.S.C. 181 et seq., 226(g)), Act of Feb. 5, 1948 (25 U.S.C. 323–324), & Energy Act of 2020 (43 U.S.C. 3001): Existing law governs federal oil and gas drilling permits, non-federal land lease conditions, rights-of-way across Indian land, renewable energy right-of-way processing, and court review deadlines for covered energy, mineral, and wildfire authorizations.

Division B, Title II, Subtitles A–B (Sections 2201–2213): Sets a 150-day statute of limitations and 180-day remand schedule for covered authorizations; exempts covered oil and gas actions on non-federal land within drilling or spacing units from federal permits to drill and limits specified Mineral Leasing Act section 17(g) authorities on covered non-federal land; lets Tribes grant rights-of-way over Tribal land under Interior-approved Tribal rules (with a 180-day approval timeline, subject to extension); and sets completeness, notice of intent, cost recovery, and decision timelines for eligible renewable energy right-of-way applications.

Electric Grid Projects & Hardrock Mining Mill Sites (Sections 2214–2215): Governed by existing federal grid, public land, and mining authorities.

Sections 2214–2215: Directs the Secretaries of the Interior and Agriculture to develop or adopt categorical exclusions within 180 days—subject to extraordinary circumstances—for placing transmission or distribution facilities in approved rights-of-way; repairing, maintaining, replacing, upgrading, modifying, optimizing, or making minor relocations or additions to existing facilities within existing rights-of-way or previously disturbed or developed land; and constructing, operating, upgrading, or decommissioning battery and other energy-storage technology on previously disturbed or developed land (Section 2214); and authorizes additional mill-site claims of up to five acres each on public land that are reasonably necessary for waste-rock or tailings disposal or related mineral development operations under an approved plan of operations, without conveying mineral rights (Section 2215).

Geothermal Steam Act of 1970 & Energy Policy Act of 2005 NEPA Exclusions (Sections 2221–2229, pp. 318–351): Existing law governs geothermal leasing, royalties, drilling permits, pending-litigation processing, cost recovery, and NEPA applicability for oil, gas, and geothermal activities.

Sections 2221–2229: Creates a categorical exclusion for qualifying geothermal observation test projects capped at 10 acres per project and 100 acres total across multiple projects with road, equipment, duration, and restoration limits (Section 2221); revises geothermal royalty rules and defines geothermal electric generating facilities and in-service dates (Section 2222); mandates annual geothermal lease sales with same-year replacement sales if cancelled or delayed and sets completeness and action deadlines for drilling permits (Section 2223); establishes a Bureau of Land Management geothermal ombudsman and permitting task force (Section 2224); removes federal drilling permits on non-Federal surface estates where the U.S. owns under 50% of the subsurface geothermal estate upon submission of a State permit, excluding Indian land and preserving royalties/inspections (Section 2225); requires approval/issuance or denial of covered authorizations under an existing lease within 60 days after completing applicable federal-law requirements notwithstanding a pending civil action, unless a federal court vacates the lease/authorization or grants injunctive relief without altering judicial relief authority (Section 2226); authorizes cost recovery for leasing, permitting, inspection, and monitoring with hardship/resource-use reductions and limits on use of collected amounts (Section 2227); mandates Gold Book identification within 1 year, publication within 270 days, consultation, and 5-year reviews (Section 2228); and expands Energy Policy Act exclusions to geothermal activities while providing in new subsection (c)(2) that activities described in amended subsection (b) requiring Mineral Leasing Act permits or Geothermal Steam Act drilling permits are not subject to NEPA requirements (Section 2229).

Federal Power Act Hydropower & Micro-Hydrokinetic Provisions (Sections 2231–2234): Existing law governs hydropower licensing, project alterations and maintenance, and small hydrokinetic projects.

Sections 2231–2234: Requires FERC to report to Congress within 270 days on hydropower market barriers (covering compensation, regulatory/market mechanisms, and ownership/development models) after public input (Section 2231); requires specified Federal Power Act license conditions to be reasonably related to project effects (Section 2232); distinguishes substantial alterations, nonsubstantial alterations, and routine maintenance/repairs, removing certain approval requirements for routine maintenance and specified temporary variances beyond a licensee's reasonable control via FERC guidance and a final rule while preserving dam-safety authority (Section 2233); and establishes a 10- to 20-year expedited licensing framework and low-disturbance categorical exclusions for qualifying micro-hydrokinetic projects up to 5 megawatts, plus a report to Congress (Section 2234).

Department of Energy Organization Act, Pacific Northwest Electric Power Planning and Conservation Act & FERC Security (Sections 2241–2243): Existing law governs FERC consultation/certification requirements, 16 U.S.C. §839b(c)(10)(B), and FERC employee law-enforcement authority.

Sections 2241–2243: Removes a paragraph from FERC consultation requirements in the Department of Energy Organization Act and adds economic or legal qualifications to specified certification requirements (Section 2241); amends Section 4(c)(10)(B) of the Pacific Northwest Electric Power Planning and Conservation Act (16 U.S.C. §839b(c)(10)(B)) by adding the phrase "since the date of enactment of the Bipartisan American Affordability and Jobs Act of 2026" (Section 2242); and authorizes FERC to allow Commission employees to perform law-enforcement duties as needed to protect the Chairman and Commissioners during official duties (Section 2243).

Outer Continental Shelf Lands Act & Offshore Transmission (Sections 2251–2252): Existing law governs Outer Continental Shelf use conflicts, protected area exclusions, and offshore transmission routing and permitting.

Sections 2251–2252: Revises Outer Continental Shelf Lands Act interference-with-other-uses language, modifies applicability rules for National Park System units, National Wildlife Refuge System units, National Marine Sanctuaries, and National Monuments, and allows electricity-transmission rights-of-way in National Marine Sanctuaries with permits running for the right-of-way duration (Section 2251); and requires the Secretaries of the Interior and Energy to identify preferred offshore transmission routes within 2 years (reviewed at least every 3 years), designating Interior as lead agency for authorizations and environmental reviews under a 2-year rulemaking (Section 2252).

National Historic Preservation Act & Historic Preservation Fund (Sections 2301–2302): Existing law governs Section 106 historic-preservation reviews, programmatic agreements, National Register procedures, State historic-preservation program evaluations, and Historic Preservation Fund authorities, including Section 303102 deposits.

Sections 2301–2302: Revises Section 106 review steps (30-day undertaking determination after a review request, area of potential effects narrowed to where an undertaking may cause a defined adverse effect and excluding areas affected solely by project parts outside federal control or responsibility, property identification, consultation, 30-day information-incorporation period, and consultation/advisory-comment timelines), defines adverse effects to include reasonably foreseeable consequences directly altering characteristics to diminish integrity, excludes visual, atmospheric, or audible effects unless they would have a direct impact that would significantly diminish eligible characteristics, bars non-signatories from suing over implementation of covered programmatic agreements, limits post-start National Register review reopenings, establishes State program evaluation rules (2-year cure period for disapproval, timeline/metric compliance, suspension of specified contracts/agreements/grants upon disapproval of a program or major aspect, federal assumption of State Historic Preservation Officer functions in specified circumstances, and fiscal audits at least every 4 years), and creates a new Tribal program-evaluation framework (evaluations at least every 2 years after approval, disapproval/suspension rules, federal assumption of functions in specified circumstances, and fiscal audits at least every 4 years) (Section 2301); authorizes $200 million annually (FY2027–FY2036) for the Historic Preservation Fund (Section 2302(a)); makes Section 303102 deposits for FY2027+ available starting FY2028 without further appropriation or fiscal-year limit for specified purposes (Section 2302(b)); and authorizes $20 million annually (FY2027–FY2030) for Tribal Historic Preservation Officer grants for online database development, subject to coordination, sensitive property protections, and annual reporting (Section 2302(c)(5)).

5. Fiscal Impact Summary

No official Congressional Budget Office (CBO—the nonpartisan agency that gives Congress budget and cost estimates) score or other applicable government fiscal analysis has been sourced.

To keep budget concepts distinct, the bill text contains authorizations of appropriations (amounts Congress is authorized to approve in future funding bills), which are not the same as actual appropriations and spending (money actually made available and spent) or estimated budgetary effects (projected impacts on federal spending, revenues, and deficits). Statutory funding authorizations and expenditure-availability rules identified in the reviewed bill text are:

Provision

Statutory Amount or Rule

Budget Category & Notes

Section 1133 — Permitting Improvement Fund

$20,000,000 annually, FY2027–FY2033

Authorization of appropriations only; does not establish actual appropriations, spending, or a CBO estimate.

Section 1307 — Endangered Species Act programs

$150,000,000 annually, FY2027–FY2031

Authorization of appropriations only; does not establish actual appropriations, spending, or a CBO estimate.

Section 1308 — Coastal State Fund

$50,000,000 annually, FY2028–FY2032

Authorization of appropriations (subject to availability of appropriations); does not establish actual appropriations, spending, or a CBO estimate.

Section 2302(a) — Historic Preservation Fund Authorization

$200,000,000 annually, FY2027–FY2036

Authorization of appropriations only; separate from Section 2302(b) expenditure availability and Section 2302(c)(5) grant authorization.

Section 2302(b) — Historic Preservation Fund Expenditure Availability

Amounts deposited in the Historic Preservation Fund under Section 303102 for FY2027 and later made available for expenditure beginning in FY2028 without further appropriation or fiscal-year limitation for specified purposes

Expenditure-availability provision; distinct from Section 2302(a)'s annual authorization and Section 2302(c)(5)'s grant authorization.

Section 2302(c)(5) — Tribal Historic Preservation Officer grants

$20,000,000 annually, FY2027–FY2030

Separate authorization of appropriations for Tribal Historic Preservation Officer grant program; does not establish actual appropriations, spending, or a CBO estimate.

6. Household Impact Matrix

No CBO Report available to provide estimates.

7. Provisions Requiring Review

  • Section 1102(a)(18) (NEPA exclusions): Uses conditional language and agency judgment on whether an action has "substantial Federal control and responsibility," "no or minimal Federal funding," "predominant control and responsibility," or a "similar function" under other laws. Analytical/legal review question: How these exclusions interact with amended NEPA definitions and other provisions in specific agency actions.

  • Section 1110 (Judicial Review): Limits court remedies for covered NEPA claims to remand without vacatur (a court sends a decision back to an agency for further work but does not automatically cancel the decision) or injunctions, except under stated preliminary injunction rules or certain Tribal trust resource claims. Analytical/legal review question: The practical scope of Tribal trust resource exceptions and preliminary-injunction standards in litigation.

  • Section 1202 (Water Quality Certifications, pp. 103–122): Sets prefiling, public-notice, completeness, and review deadlines (up to 1 year, or 9 months for covered interstate linear infrastructure), written extension rules, voluntary withdrawal/resubmission restart rules, automatic and affirmative waiver rules (with waivers not subject to judicial review), and clear-and-convincing evidence limits on denials/conditions. Analytical/legal review question: How the waiver and certification rules apply to particular permitting scenarios beyond the express statutory mechanics.

  • Sections 1401–1402 (Project Certainty and disparate treatment claims, pp. 158–165+): Restricts covered new actions on existing authorizations in effect on or after September 16, 2026, for non-Federal sponsors (with remedies of 25%–50% of incurred project costs under stated factors) and creates a pattern of disparate treatment (a demonstrated pattern of different treatment under statutory criteria) cause of action with remedies of 50%–100% of reasonably expected construction costs under stated conditions. Analytical/legal review question: How the statutory exceptions, evidentiary requirements, and comparator criteria apply to particular claims.

  • Section 2107 (Ratepayer Protection, pp. 226–239): Directs FERC to revise its 1994 transmission pricing policy within 270 days and establish rules on embedded average costs, incremental costs, exit charges, and financial assurances for covered computational loads of 20 megawatts or more while preserving prior FERC- or State-approved service arrangements. Analytical/legal review question: How FERC transmission-pricing rules interact with State retail-rate and solicitation authority.

  • Section 2301 (National Historic Preservation Act revisions): Revises Section 106 definitions, timelines, and effects exclusions, bars non-signatory suits over covered programmatic agreements, limits post-start National Register review reopenings, and establishes State and Tribal program-evaluation, suspension, federal-assumption, and 4-year fiscal-audit rules. Analytical/legal review question: How the revised definitions, review timelines, and State/Tribal program-evaluation and oversight provisions will operate in specific historic-preservation reviews and program evaluations.

8. What This Bill Does Not Do

  • No official CBO estimate or other applicable government fiscal analysis was identified to include in the review. No estimated household impact can be determined.

  • The bill text does not establish household savings, household cost increases, utility bill changes, or local government fiscal outcomes without official fiscal or empirical analysis.

The Ledger is Closed,

LegisLedger | Civic Intelligence. Clearly Delivered.

Legal Disclosures & Compliance Physical Address: LegisLedger Media LLC | [PO Box 284] | [Peebles, Ohio 45660]

Copyright: © 2026 LegisLedger. All rights reserved. No part of this publication may be reproduced or transmitted without express written permission.

Trademark: LegisLedger is a trademark of LegisLedger Media LLC. Trademark registration pending.

DMCA Notice: To report intellectual property infringement, please contact our designated agent at [[email protected]].

Privacy & Transparency You are receiving this because you opted in at [thelegisledger.org].

We value your data privacy; review our Privacy Policy and Terms of Service.

Keep the LegisLedger independent. We accept no lobbyist or corporate funding. If you value non-partisan data, consider supporting our mission: buymeacoffee.com/TheLegisLedger